Groundwater remediation •
Leachate treatment plants for landfills and industry •
Processing technology •
Restoration of contaminated sites •
Sewage treatment plants (STP), industrial •
Soil remediation • |
Business : |
Manufacturer |
Ranking among the best means constantly setting new standards. This is a challenge to which we, at Züblin, respond readily – every day around the globe.
Our experienced project teams, in cooperation with our clients, realize technically and economically optimized construction projects of any type or size. Highly qualified engineers on site ensure that the work is carried out exactly as specified and on schedule.
Our success is driven by the know-how and innovative strength of our workforce. With the support of scientists, business economists and commercial staff, our engineers develop and enhance forward-looking technologies. This technical excellence, combined with sound economic practice, has made Züblin an efficient and reliable partner - over the past 100 years.
For more than 100 years Züblin has always been providing the market with the latest technology. For this reason Züblin is highly appreciated and known by customers to provide the best solutions for the most challenging construction tasks. Day by day our engineers are finding solutions and pushing new technologies forward to meet customers needs. Thereby our centre of excellence is working in close cooperation with our highly skilled operation units. A main key factor for all construction projects remains the right technology. Züblin develops the best possible solution for you.
| Combined sewer, Freising (Germany) This combined sewer with a length of 5.7 km was driven through the aquifer using an earth-pressure-balance shield. The reinforced concrete pipes have an internal diameter of up to DN 2200. |
| Cut-off wall at Haveleck, Berlin Installation of a 570 m long and 60 cm thick single-phase cut-off wall for the containment of contamination on an 18,500 m² site located right next to the river Havel. With a max. depth of 54 m, the cut-off wall panels extend 2 m into the brown-coal silt aquiclude. The single-phase cut-off wall covers an area of 26,000 m² |
| Digesters These three egg-shaped, prestressed concrete digesters have a capacity of 16,700 m³ each, making them the largest structures of this type in the world. They have a diameter of 29.4 m and a height of 46.7 m.* |
| Pumped-storage plant, Goldisthal Lignite-fired power stations are difficult to regulate: they supply the same amount of energy around the clock. The surplus electricity generated at night is used by pumped-storage plants to replenish the upper reservoir. During the day, hydropower plants can then supply peak-load electricity to the grid within a matter of seconds. With a total capacity of 1,060 MW, the Goldisthal pumped-storage plant ranks among the largest and technically most advanced plants of this type in Europe. The upper reservoir holds 12 million m³ of water; the machine hall and transformer cavern have a total excavated volume of 185,000 m³. There is a difference in elevation of 300 m between the upper and the lower reservoir | |
|
|
|
|